• PLANT-STRUCTURAL DESIGN
    • Modular Portable Pug Mill
    • Reaction Tanks Access
    • Picking Station
    • Agitator Tower
    • Primary Crusher Module
    • Solomon Primary School
    • Pump PU41 Access
    • Pump PU20/58 Access
    • Guarding for Vibrating Screens
    • Valves Access Platforms
    • Valves Access Stairs
  • MATERIALS HANDLING
    • Silver Charging Conveyor
    • Silver Vacuum Unit
    • Destacking Trolleys
    • Stillage Conveing System
    • Slag Conveyor
    • Thevenard Hopper Screen
    • Supper Hopper
  • PIPING-DUCTING
    • Electrolite Tank Flues
    • Gas Extraction
    • Charge Port Venting
    • Colling Tower Piping
  • SPECIALISED EQUIPMENT
    • Gas Train Isolation
    • Horizontal Damper for Sinter Machine
  • INFRASTRUCTURE
    • Warf Unloading Facility


Bartco Design P/L,

  • Home
  • Services
  • Contact Us

Plant Design



Valves Access Platforms (BHP Billiton / Roxby Down - 2012)

A concept design to access two valves located on 300mm dia pipes was completed for BHP Billiton in March 2012.
In order to provide the access, a system of 3 new platforms and 2 new of stairs was designed. The new access is connected to existing overburden access stairway





3D Model- Autodesk Inventor




Layout




3D Arrangement