Plant Design
Valves Access Platforms (BHP Billiton / Roxby Down - 2012)
A concept design to access two valves located on 300mm dia pipes was completed for BHP Billiton in March 2012.
In order to provide the access, a system of 3 new platforms and 2 new of stairs was designed. The new access is connected to existing overburden access stairway
3D Model- Autodesk Inventor